Heavy Industries — Est. 1994 00000t
Press capacity · calibrating
Gantry machining centre in a KALDERA assembly hall
Hall 04 — 12,000 t press frame, pre-shipment run

Complete heavy-machinery lines

Built to run for thirty years.

We design, cast, machine and commission the lines that forge, crush, roll and grind — then we stand behind them for the life of the plant.

01Position

A heavy machine is a promise about time. Ours are cut from steel we melt ourselves, measured to eight microns, assembled twice, and run under load before they are taken apart for the container. Nothing here is fast. Everything here is final.

Macro of a carburised gear flank
Ground gear flank, module 40 — 8 µm profile tolerance
Ladle pouring molten steel in the KALDERA foundry
Robotic welding cells joining a heavy steel frame
Technicians assembling a large industrial gearbox

02Capability

01

We melt our own steel.

Two 30-tonne electric arc furnaces and a ladle refining station. Every heat is spectrometer-verified before it is poured, so the chemistry printed on the certificate is the chemistry standing in your plant.

Furnace
2 × 30 t EAF
Max casting
68 t single piece
02

We weld to pressure-vessel code.

Sixty-four robotic cells and a certified manual shop working to ASME IX. Full-penetration seams on load-bearing structures are ultrasonically tested at one hundred per cent — not sampled.

Welding cells
64 robotic
Seam inspection
100 % UT
03

We build it twice.

Every line is fully assembled in Hall 04, run under load for seventy-two hours, then dismantled and marked for shipment. Your commissioning engineers meet a machine that has already worked.

Load trial
72 h continuous
Crane capacity
400 t single lift

03Equipment

Four lines, built to order, never from a catalogue.

2026 programme
KA-12000 hydraulic forging press
01

KA-12000
Forging Press

Four-column hydraulic press for open-die and closed-die work, supplied with manipulator, furnace handling and a full control cabinet.

Press force
12,000 t
Table
4,200 × 2,600 mm
Stroke
2,000 mm
Cycle
42 s
02

CR-900
Cone Crusher

Hydraulic-set cone crusher for hard rock and ore. Bronze bushings, tramp-release accumulators, liners rated for twenty-six months of continuous duty.

Feed opening
350 mm
Capacity
620 t/h
Drive
630 kW
Mass
84 t
CR-900 cone crusher
RM-4H four-high rolling mill stand
03

RM-4H
Rolling Mill

Four-high reversing stand with hydraulic gap control and automatic flatness correction. Delivered as a stand, or as a complete cold-rolling line.

Strip width
1,650 mm
Rolling force
25 MN
Line speed
1,200 m/min
Gauge tol.
± 0.008 mm
04

BM-56
Grinding Line

Ball mill with girth-gear or central drive, classifier, and the complete pneumatic circuit. Erected under our supervision, anywhere.

Cylinder
⌀ 5.6 × 8.5 m
Throughput
320 t/h
Drive
4,500 kW
Liner life
26 months
BM-56 ball mill grinding line
KALDERA Hall 04, 180,000 square metres under crane
Hall 04 — 62 m span, two 200 t cranes in tandem

04The works

Everything that matters happens under one roof.

  • 0 Covered manufacturing floor across four halls
  • 0 t Maximum single-piece lift, hook to hook
  • 0 people Of whom 148 are engineers and metallurgists
  • 0 years Of continuous production on the same site
Macro of a full-penetration weld seam
Full-penetration seam on 120 mm plate — ultrasonically tested end to end
Aerial view of the KALDERA export yard with crated equipment
Export yard — a 4,500 t/d grinding line, crated for Aktau

05Standards

Certified where it counts, audited where it hurts.

Third-party surveillance every twelve months. Every certificate below is current and available as a PDF on request, together with the mill certificates for your specific order.

Coordinate measuring machine probing a machined component
CMM room, 20 °C ± 1 — every critical feature, every unit
StandardScopeBodyValid
ISO 9001:2015Quality managementTÜV SÜD2028
ISO 14001:2015Environmental managementTÜV SÜD2028
ISO 45001:2018Occupational health & safetyTÜV SÜD2027
2006/42/ECCE — Machinery DirectiveNotified body 0044Ongoing
TR CU 010/2011EAC — Eurasian conformityRostest2027
ASME Section VIIIU-stamp, pressure partsNational Board2027
API Q1Oil & gas scopeAPI2026

06Delivery

Forty-six countries. Two of them by icebreaker.

  • 14Europe
  • 9Central Asia & Caucasus
  • 8Southeast Asia
  • 7Middle East & North Africa
  • 5Latin America
  • 3Sub-Saharan Africa
YearSectorCountryScope
2025CementKazakhstan4,500 t/d clinker grinding line
2025MiningChile2 × CR-900 crushing plant
2024SteelTürkiye1,650 mm cold rolling mill
2024ForgingPoland12,000 t press and manipulator
2023CementViet NamRaw mill and kiln drive train
2023SteelBrazilHot strip finishing stands F4–F7
Heavy-lift vessel loading oversized equipment at dawn
Ningbo–Zhoushan — heavy-lift sailing, 06:10

We ship the machine, the spares, the tools and the two people who know it best.

07Enquiries

Send us the tonnage and the tolerance.

Give us your throughput, your material and your site conditions. You will have a technical proposal and a budget price within ten working days — signed by the engineer who wrote it.

Request a quotationRequest a quotation
  • Salessales@kaldera-hi.com
  • Service+86 574 8800 1994
  • WorksNo. 9 Beilun Industrial Road, Ningbo